RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3105034181 - Archived data from Wed, 16. June 2021 15:52:14 CEST


This is all the information about APD 3105034181. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3105034181
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 20.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 124
Position in Box: 10
EP1 batch: 136
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.7696258 V     T = -25 °C: 343.663848 V
Voltage for Gain 150: T = +20 °C: 386.5637136 V     T = -25 °C: 350.8993928 V
Voltage for Gain 200: T = +20 °C: 390.8855535 V     T = -25 °C: 354.9521285 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.742899064 V-1     T = -25 °C: 4.829503673 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.588040073 V-1     T = -25 °C: 9.874352121 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.97210511 V-1     T = -25 °C: 15.77336281 V-1
Break-through voltage: T = +20 °C: 406.5335206 V     T = -25 °C: 370.1734972 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:39:17 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:11 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:59:36 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:14 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:21 CET jreher Updated box and position via API.
11. Aug 2020 18:07:46 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:07 CEST jreher Updated APD location via API.
06. Mar 2020 13:55:00 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:38 CET jreher Updated APD location via API.
27. Nov 2019 19:50:38 CET jreher Updated APD location via API.
25. Nov 2019 17:20:45 CET jreher Updated box and position via API.
30. Aug 2019 11:32:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:52 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:36 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:56 CEST Tobias Imported from Hamamatsu datasheet.