RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3105034155 - Archived data from Wed, 21. April 2021 11:03:00 CEST


This is all the information about APD 3105034155. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3105034155
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.2 V
Dark current: 20.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 123
Position in Box: 40
EP1 batch: 135
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2885747 V     T = -25 °C: 343.9624971 V
Voltage for Gain 150: T = +20 °C: 387.0181963 V     T = -25 °C: 351.1923194 V
Voltage for Gain 200: T = +20 °C: 391.2904012 V     T = -25 °C: 355.2555195 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.55958757 V-1     T = -25 °C: 5.031800459 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.154069213 V-1     T = -25 °C: 9.412414134 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.42564393 V-1     T = -25 °C: 14.96276724 V-1
Break-through voltage: T = +20 °C: 406.7640607 V     T = -25 °C: 370.4485792 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:30:22 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:03:00 CEST jreher Updated box and position via API.
05. Feb 2021 11:04:17 CET jreher Updated box and position via API.
11. Aug 2020 18:07:42 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:05 CEST jreher Updated APD location via API.
06. Mar 2020 13:54:41 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:37 CET jreher Updated APD location via API.
27. Nov 2019 19:50:29 CET jreher Updated APD location via API.
25. Nov 2019 17:20:43 CET jreher Updated box and position via API.
30. Aug 2019 11:31:26 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:36 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:55 CEST Tobias Imported from Hamamatsu datasheet.