RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3104034115 - Archived data from Mon, 30. August 2021 14:08:26 CEST


This is all the information about APD 3104034115. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3104034115
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377 V
Dark current: 19.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 123
Position in Box: 22
EP1 batch: 134
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.3083896 V     T = -25 °C: 342.05241 V
Voltage for Gain 150: T = +20 °C: 385.0667152 V     T = -25 °C: 349.2863251 V
Voltage for Gain 200: T = +20 °C: 389.4249178 V     T = -25 °C: 353.3659489 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.704165503 V-1     T = -25 °C: 5.03767265 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.869904685 V-1     T = -25 °C: 9.412010992 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 16.07388594 V-1     T = -25 °C: 14.82589598 V-1
Break-through voltage: T = +20 °C: 404.9355163 V     T = -25 °C: 368.5633697 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:40:25 CEST oafedulidis Assigned to capsule by script
30. Aug 2021 14:08:26 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:15 CET jreher Updated box and position via API.
11. Aug 2020 18:07:39 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:03 CEST jreher Updated APD location via API.
06. Mar 2020 13:54:39 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:35 CET jreher Updated APD location via API.
27. Nov 2019 19:50:28 CET jreher Updated APD location via API.
25. Nov 2019 17:20:41 CET jreher Updated box and position via API.
30. Aug 2019 11:30:48 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:45 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:35 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:55 CEST Tobias Imported from Hamamatsu datasheet.