RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3104034107 - Archived data from Tue, 11. August 2020 18:07:38 CEST


This is all the information about APD 3104034107. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3104034107
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.3 V
Dark current: 20.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 123
Position in Box: 15
EP1 batch: 134
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.5281492 V     T = -25 °C: 343.5658821 V
Voltage for Gain 150: T = +20 °C: 386.3646285 V     T = -25 °C: 350.8329564 V
Voltage for Gain 200: T = +20 °C: 390.7132244 V     T = -25 °C: 354.9234664 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.423674029 V-1     T = -25 °C: 4.797302188 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.654999616 V-1     T = -25 °C: 9.777443255 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.96119746 V-1     T = -25 °C: 15.49121361 V-1
Break-through voltage: T = +20 °C: 405.8752654 V     T = -25 °C: 369.7377398 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 18:45:27 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:04:14 CET jreher Updated box and position via API.
18. Dec 2020 14:01:20 CET jreher Updated box and position via API.
11. Aug 2020 18:07:38 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:03 CEST jreher Updated APD location via API.
06. Mar 2020 13:54:16 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:35 CET jreher Updated APD location via API.
27. Nov 2019 19:50:27 CET jreher Updated APD location via API.
25. Nov 2019 17:20:41 CET jreher Updated box and position via API.
30. Aug 2019 11:30:47 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:45 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:35 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:55 CEST Tobias Imported from Hamamatsu datasheet.