RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3104034100 - Archived data from Fri, 06. March 2020 13:54:16 CET


This is all the information about APD 3104034100. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3104034100
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Giessen
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D14
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.4 V
Dark current: 19.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 123
Position in Box: 9
EP1 batch: 134
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:13 CET jreher Updated box and position via API.
11. Aug 2020 18:07:37 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:02 CEST jreher Updated APD location via API.
06. Mar 2020 13:54:16 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:34 CET jreher Updated APD location via API.
27. Nov 2019 19:50:27 CET jreher Updated APD location via API.
25. Nov 2019 17:20:41 CET jreher Updated box and position via API.
30. Aug 2019 11:30:47 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:44 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:34 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:55 CEST Tobias Imported from Hamamatsu datasheet.