RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3104034096 - Archived data from Mon, 17. May 2021 09:15:33 CEST


This is all the information about APD 3104034096. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3104034096
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F13
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 384.3 V
Dark current: 18 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 123
Position in Box: 5
EP1 batch: 134
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.5516785 V     T = -25 °C: 348.3259058 V
Voltage for Gain 150: T = +20 °C: 391.3853409 V     T = -25 °C: 355.7408395 V
Voltage for Gain 200: T = +20 °C: 395.7358692 V     T = -25 °C: 359.8865553 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.486029362 V-1     T = -25 °C: 4.825838932 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.794655315 V-1     T = -25 °C: 9.867612691 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.47366954 V-1     T = -25 °C: 15.75601933 V-1
Break-through voltage: T = +20 °C: 410.2948641 V     T = -25 °C: 374.4677746 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:21:06 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:15:33 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:13 CET jreher Updated box and position via API.
11. Aug 2020 18:07:36 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:02 CEST jreher Updated APD location via API.
06. Mar 2020 13:54:15 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:34 CET jreher Updated APD location via API.
27. Nov 2019 19:50:27 CET jreher Updated APD location via API.
25. Nov 2019 17:20:40 CET jreher Updated box and position via API.
30. Aug 2019 11:30:47 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:44 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:34 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:55 CEST Tobias Imported from Hamamatsu datasheet.