RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3104034095 - Archived data from Tue, 11. August 2020 18:07:36 CEST


This is all the information about APD 3104034095. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3104034095
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 16.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 123
Position in Box: 4
EP1 batch: 134
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0218098 V     T = -25 °C: 344.0971451 V
Voltage for Gain 150: T = +20 °C: 386.8198492 V     T = -25 °C: 351.3841491 V
Voltage for Gain 200: T = +20 °C: 391.1557499 V     T = -25 °C: 355.4855592 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.630484661 V-1     T = -25 °C: 4.941695565 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.146314735 V-1     T = -25 °C: 9.210850477 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.29854265 V-1     T = -25 °C: 16.44208573 V-1
Break-through voltage: T = +20 °C: 405.9141752 V     T = -25 °C: 370.0038774 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:13 CET jreher Updated box and position via API.
11. Aug 2020 18:07:36 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:02 CEST jreher Updated APD location via API.
06. Mar 2020 13:54:15 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:34 CET jreher Updated APD location via API.
27. Nov 2019 19:50:27 CET jreher Updated APD location via API.
25. Nov 2019 17:20:40 CET jreher Updated box and position via API.
30. Aug 2019 11:30:46 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:44 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:34 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:55 CEST Tobias Imported from Hamamatsu datasheet.