RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3104034093 - Archived data from Wed, 16. June 2021 16:02:37 CEST


This is all the information about APD 3104034093. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3104034093
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 15.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 123
Position in Box: 2
EP1 batch: 134
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.6269195 V     T = -25 °C: 344.5257945 V
Voltage for Gain 150: T = +20 °C: 387.4383881 V     T = -25 °C: 351.8324008 V
Voltage for Gain 200: T = +20 °C: 391.7714377 V     T = -25 °C: 355.9544263 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.406070492 V-1     T = -25 °C: 4.756720381 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.590032708 V-1     T = -25 °C: 9.649986492 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.86233182 V-1     T = -25 °C: 15.26143802 V-1
Break-through voltage: T = +20 °C: 406.4848871 V     T = -25 °C: 370.5708322 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:41:51 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:02:37 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:58:54 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:51:44 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:13 CET jreher Updated box and position via API.
11. Aug 2020 18:07:35 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:02 CEST jreher Updated APD location via API.
06. Mar 2020 13:54:15 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:34 CET jreher Updated APD location via API.
27. Nov 2019 19:50:26 CET jreher Updated APD location via API.
25. Nov 2019 17:20:40 CET jreher Updated box and position via API.
30. Aug 2019 11:30:46 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:44 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:34 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:55 CEST Tobias Imported from Hamamatsu datasheet.