RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3104034088 - Archived data from Fri, 05. February 2021 11:04:10 CET


This is all the information about APD 3104034088. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3104034088
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 16.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 122
Position in Box: 47
EP1 batch: 134
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.3222965 V     T = -25 °C: 345.1723636 V
Voltage for Gain 150: T = +20 °C: 388.1208045 V     T = -25 °C: 352.487117 V
Voltage for Gain 200: T = +20 °C: 392.4604146 V     T = -25 °C: 356.5952607 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.517191166 V-1     T = -25 °C: 4.931057574 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.896369602 V-1     T = -25 °C: 9.08675818 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.57563406 V-1     T = -25 °C: 16.17133779 V-1
Break-through voltage: T = +20 °C: 407.0869297 V     T = -25 °C: 371.1233186 V
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:44:23 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:18 CEST jreher Updated box and position via API.
05. Feb 2021 11:04:10 CET jreher Updated box and position via API.
11. Aug 2020 18:00:51 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:01 CEST jreher Updated APD location via API.
28. Jan 2020 16:15:47 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:33 CET jreher Updated APD location via API.
27. Nov 2019 19:50:19 CET jreher Updated APD location via API.
25. Nov 2019 17:20:39 CET jreher Updated box and position via API.
30. Aug 2019 11:30:46 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:39 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:34 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:55 CEST Tobias Imported from Hamamatsu datasheet.