RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3104034082 - Archived data from Tue, 11. August 2020 18:00:50 CEST


This is all the information about APD 3104034082. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3104034082
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.7 V
Dark current: 20.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 122
Position in Box: 41
EP1 batch: 133
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1432346 V     T = -25 °C: 344.9645536 V
Voltage for Gain 150: T = +20 °C: 387.9623998 V     T = -25 °C: 352.2591543 V
Voltage for Gain 200: T = +20 °C: 392.3147492 V     T = -25 °C: 356.3695523 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.581975669 V-1     T = -25 °C: 5.009607722 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.046822843 V-1     T = -25 °C: 9.369878537 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.06727483 V-1     T = -25 °C: 14.78308856 V-1
Break-through voltage: T = +20 °C: 407.4729054 V     T = -25 °C: 371.2484758 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:15:42 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:30:46 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:10 CET jreher Updated box and position via API.
11. Aug 2020 18:00:50 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:01 CEST jreher Updated APD location via API.
28. Jan 2020 16:15:46 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:33 CET jreher Updated APD location via API.
27. Nov 2019 19:50:18 CET jreher Updated APD location via API.
25. Nov 2019 17:20:38 CET jreher Updated box and position via API.
30. Aug 2019 11:30:09 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:39 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:34 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:55 CEST Tobias Imported from Hamamatsu datasheet.