RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3104034076 - Archived data from Wed, 16. June 2021 16:01:06 CEST


This is all the information about APD 3104034076. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3104034076
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.3 V
Dark current: 18.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 122
Position in Box: 38
EP1 batch: 133
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.9638149 V     T = -25 °C: 350.2757941 V
Voltage for Gain 150: T = +20 °C: 393.7603188 V     T = -25 °C: 357.7267674 V
Voltage for Gain 200: T = +20 °C: 398.0746998 V     T = -25 °C: 361.9018738 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.657074405 V-1     T = -25 °C: 4.790754982 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.300894505 V-1     T = -25 °C: 9.706004702 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.64990402 V-1     T = -25 °C: 15.38922971 V-1
Break-through voltage: T = +20 °C: 412.2001621 V     T = -25 °C: 376.1925143 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:38:42 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:04:54 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:01:06 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:53:52 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:09 CET jreher Updated box and position via API.
11. Aug 2020 18:00:49 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:00 CEST jreher Updated APD location via API.
28. Jan 2020 16:15:46 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:33 CET jreher Updated APD location via API.
27. Nov 2019 19:50:18 CET jreher Updated APD location via API.
25. Nov 2019 17:20:38 CET jreher Updated box and position via API.
30. Aug 2019 11:30:08 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:38 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:34 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:55 CEST Tobias Imported from Hamamatsu datasheet.