RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3103034028 - Archived data from Tue, 11. August 2020 18:00:43 CEST


This is all the information about APD 3103034028. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3103034028
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.5 V
Dark current: 18.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 122
Position in Box: 6
EP1 batch: 132
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.6200188 V     T = -25 °C: 347.8718314 V
Voltage for Gain 150: T = +20 °C: 390.4212392 V     T = -25 °C: 355.2779744 V
Voltage for Gain 200: T = +20 °C: 394.7465349 V     T = -25 °C: 359.5303767 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.425898321 V-1     T = -25 °C: 4.908815606 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.682026519 V-1     T = -25 °C: 9.670835863 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.16183077 V-1     T = -25 °C: 15.7335391 V-1
Break-through voltage: T = +20 °C: 411.3661906 V     T = -25 °C: 373.574556 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:05 CET jreher Updated box and position via API.
11. Aug 2020 18:00:43 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:58 CEST jreher Updated APD location via API.
28. Jan 2020 16:13:55 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:30 CET jreher Updated APD location via API.
27. Nov 2019 19:50:16 CET jreher Updated APD location via API.
25. Nov 2019 17:20:35 CET jreher Updated box and position via API.
30. Aug 2019 11:29:33 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:36 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:33 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:54 CEST Tobias Imported from Hamamatsu datasheet.