RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3103034026 - Archived data from Tue, 16. February 2021 12:27:35 CET


This is all the information about APD 3103034026. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3103034026
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.3 V
Dark current: 14 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 122
Position in Box: 5
EP1 batch: 132
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.5766593 V     T = -25 °C: 346.393234 V
Voltage for Gain 150: T = +20 °C: 389.4172714 V     T = -25 °C: 353.691797 V
Voltage for Gain 200: T = +20 °C: 393.7684737 V     T = -25 °C: 357.7725874 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.406053755 V-1     T = -25 °C: 4.831518412 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.586959439 V-1     T = -25 °C: 9.893278648 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.87798529 V-1     T = -25 °C: 15.85332172 V-1
Break-through voltage: T = +20 °C: 409.5133664 V     T = -25 °C: 373.1356537 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 15:53:21 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:35 CET jreher Updated box and position via API.
05. Feb 2021 11:04:05 CET jreher Updated box and position via API.
11. Aug 2020 18:00:43 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:58 CEST jreher Updated APD location via API.
28. Jan 2020 16:12:17 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:30 CET jreher Updated APD location via API.
27. Nov 2019 19:50:16 CET jreher Updated APD location via API.
25. Nov 2019 17:20:35 CET jreher Updated box and position via API.
30. Aug 2019 11:29:33 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:36 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:33 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:54 CEST Tobias Imported from Hamamatsu datasheet.