RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3103034020 - Archived data from Tue, 16. February 2021 12:26:12 CET


This is all the information about APD 3103034020. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3103034020
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C12
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.5 V
Dark current: 21.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 121
Position in Box: 50
EP1 batch: 132
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.0513922 V     T = -25 °C: 347.6344447 V
Voltage for Gain 150: T = +20 °C: 390.8748313 V     T = -25 °C: 354.9940353 V
Voltage for Gain 200: T = +20 °C: 395.2262654 V     T = -25 °C: 359.1218107 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.593477881 V-1     T = -25 °C: 4.715068526 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.112048024 V-1     T = -25 °C: 9.528152005 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.11439893 V-1     T = -25 °C: 15.04522785 V-1
Break-through voltage: T = +20 °C: 410.5921072 V     T = -25 °C: 374.2329148 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:04:43 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:12 CET jreher Updated box and position via API.
05. Feb 2021 11:04:03 CET jreher Updated box and position via API.
11. Aug 2020 18:00:42 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:57 CEST jreher Updated APD location via API.
28. Jan 2020 16:12:17 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:30 CET jreher Updated APD location via API.
27. Nov 2019 19:50:08 CET jreher Updated APD location via API.
25. Nov 2019 17:20:34 CET jreher Updated box and position via API.
30. Aug 2019 11:29:33 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:32 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:33 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:54 CEST Tobias Imported from Hamamatsu datasheet.