RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3103034017 - Archived data from Tue, 11. August 2020 18:00:42 CEST


This is all the information about APD 3103034017. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3103034017
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.6 V
Dark current: 20.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 121
Position in Box: 48
EP1 batch: 132
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.8272024 V     T = -25 °C: 346.5248801 V
Voltage for Gain 150: T = +20 °C: 389.6466053 V     T = -25 °C: 353.810014 V
Voltage for Gain 200: T = +20 °C: 393.9934158 V     T = -25 °C: 357.8961481 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.653897922 V-1     T = -25 °C: 4.769149651 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.217651554 V-1     T = -25 °C: 9.692495239 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.35602438 V-1     T = -25 °C: 15.40234989 V-1
Break-through voltage: T = +20 °C: 409.6505398 V     T = -25 °C: 373.1505592 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:02 CET jreher Updated box and position via API.
11. Aug 2020 18:00:42 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:57 CEST jreher Updated APD location via API.
28. Jan 2020 16:12:17 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:30 CET jreher Updated APD location via API.
27. Nov 2019 19:50:08 CET jreher Updated APD location via API.
25. Nov 2019 17:20:34 CET jreher Updated box and position via API.
30. Aug 2019 11:29:32 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:31 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:32 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:54 CEST Tobias Imported from Hamamatsu datasheet.