Subdetector specification:  
Serial: 3103034007
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386 V
Dark current: 19.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 121
Position in Box: 40
EP1 batch: 132
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.8810145 V     T = -25 °C: 350.5018507 V
Voltage for Gain 150: T = +20 °C: 393.7374036 V     T = -25 °C: 357.9274071 V
Voltage for Gain 200: T = +20 °C: 398.0956776 V     T = -25 °C: 362.0920448 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.654723842 V-1     T = -25 °C: 4.742336934 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.334897876 V-1     T = -25 °C: 9.651288761 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.6453148 V-1     T = -25 °C: 15.30843631 V-1
Break-through voltage: T = +20 °C: 413.7330907 V     T = -25 °C: 377.5963456 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:27:34 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:46 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:02 CET jreher Updated box and position via API.
11. Aug 2020 18:00:40 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:56 CEST jreher Updated APD location via API.
28. Jan 2020 16:12:16 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:29 CET jreher Updated APD location via API.
27. Nov 2019 19:50:07 CET jreher Updated APD location via API.
25. Nov 2019 17:20:33 CET jreher Updated box and position via API.
30. Aug 2019 11:29:32 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:31 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:32 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:54 CEST Tobias Imported from Hamamatsu datasheet.