RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3103034002 - Archived data from Fri, 05. February 2021 11:04:01 CET


This is all the information about APD 3103034002. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3103034002
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.3 V
Dark current: 20.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 121
Position in Box: 36
EP1 batch: 132
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.6609005 V     T = -25 °C: 349.0226714 V
Voltage for Gain 150: T = +20 °C: 392.4441769 V     T = -25 °C: 356.4490312 V
Voltage for Gain 200: T = +20 °C: 396.7590869 V     T = -25 °C: 360.609528 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.40909181 V-1     T = -25 °C: 4.885804018 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.689235654 V-1     T = -25 °C: 9.014597948 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.16460903 V-1     T = -25 °C: 15.96343574 V-1
Break-through voltage: T = +20 °C: 411.9679139 V     T = -25 °C: 375.7701176 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:19:40 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:19:40 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:01 CET jreher Updated box and position via API.
11. Aug 2020 18:00:39 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:56 CEST jreher Updated APD location via API.
28. Jan 2020 16:12:16 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:29 CET jreher Updated APD location via API.
27. Nov 2019 19:50:07 CET jreher Updated APD location via API.
25. Nov 2019 17:20:33 CET jreher Updated box and position via API.
30. Aug 2019 11:29:31 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:31 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:32 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:54 CEST Tobias Imported from Hamamatsu datasheet.