RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3103033996 - Archived data from Fri, 05. February 2021 11:04:00 CET


This is all the information about APD 3103033996. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3103033996
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.6 V
Dark current: 14.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 121
Position in Box: 31
EP1 batch: 131
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.6194945 V     T = -25 °C: 348.0778051 V
Voltage for Gain 150: T = +20 °C: 391.4144999 V     T = -25 °C: 355.4241885 V
Voltage for Gain 200: T = +20 °C: 395.7367908 V     T = -25 °C: 359.5362841 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.438504552 V-1     T = -25 °C: 4.89428194 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.680979587 V-1     T = -25 °C: 9.116064931 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.02167184 V-1     T = -25 °C: 16.16616716 V-1
Break-through voltage: T = +20 °C: 411.0434533 V     T = -25 °C: 374.6566787 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:35:58 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:16:41 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:00 CET jreher Updated box and position via API.
11. Aug 2020 18:00:38 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:55 CEST jreher Updated APD location via API.
28. Jan 2020 16:12:16 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:28 CET jreher Updated APD location via API.
27. Nov 2019 19:50:07 CET jreher Updated APD location via API.
25. Nov 2019 17:20:33 CET jreher Updated box and position via API.
30. Aug 2019 11:28:28 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:32 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:54 CEST Tobias Imported from Hamamatsu datasheet.