RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3102033908 - Archived data from Tue, 11. August 2020 18:07:33 CEST


This is all the information about APD 3102033908. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3102033908
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 27.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 120
Position in Box: 37
EP1 batch: 130
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1778469 V     T = -25 °C: 345.3231532 V
Voltage for Gain 150: T = +20 °C: 387.9715715 V     T = -25 °C: 352.610541 V
Voltage for Gain 200: T = +20 °C: 392.3096522 V     T = -25 °C: 356.700466 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.581503346 V-1     T = -25 °C: 4.861227128 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.100932462 V-1     T = -25 °C: 9.157013423 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.18054415 V-1     T = -25 °C: 16.01364009 V-1
Break-through voltage: T = +20 °C: 406.095392 V     T = -25 °C: 370.4166327 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:54 CET jreher Updated box and position via API.
11. Aug 2020 18:07:33 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:51 CEST jreher Updated APD location via API.
02. Mar 2020 16:45:57 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:25 CET jreher Updated APD location via API.
27. Nov 2019 19:49:56 CET jreher Updated APD location via API.
25. Nov 2019 17:20:28 CET jreher Updated box and position via API.
30. Aug 2019 11:25:28 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:22 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:31 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:53 CEST Tobias Imported from Hamamatsu datasheet.