RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3101033870 - Archived data from Tue, 11. August 2020 18:07:29 CEST


This is all the information about APD 3101033870. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3101033870
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.9 V
Dark current: 15 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 120
Position in Box: 20
EP1 batch: 129
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.0240456 V     T = -25 °C: 350.3828256 V
Voltage for Gain 150: T = +20 °C: 393.8423237 V     T = -25 °C: 357.7104491 V
Voltage for Gain 200: T = +20 °C: 398.1808593 V     T = -25 °C: 361.8211281 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.581047494 V-1     T = -25 °C: 4.822507398 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.129788161 V-1     T = -25 °C: 9.868439069 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.27403054 V-1     T = -25 °C: 15.64342372 V-1
Break-through voltage: T = +20 °C: 413.3803025 V     T = -25 °C: 376.8068216 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:52 CET jreher Updated box and position via API.
11. Aug 2020 18:07:29 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:50 CEST jreher Updated APD location via API.
02. Mar 2020 16:45:56 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:24 CET jreher Updated APD location via API.
27. Nov 2019 19:49:55 CET jreher Updated APD location via API.
25. Nov 2019 17:20:27 CET jreher Updated box and position via API.
30. Aug 2019 11:26:50 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:21 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:30 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:53 CEST Tobias Imported from Hamamatsu datasheet.