RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3101033831 - Archived data from Fri, 05. February 2021 11:03:46 CET


This is all the information about APD 3101033831. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3101033831
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387.7 V
Dark current: 25.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 119
Position in Box: 37
EP1 batch: 128
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.5028262 V     T = -25 °C: 351.574257 V
Voltage for Gain 150: T = +20 °C: 395.3535985 V     T = -25 °C: 359.0240942 V
Voltage for Gain 200: T = +20 °C: 399.7126857 V     T = -25 °C: 363.2135272 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.440504826 V-1     T = -25 °C: 4.686363436 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.719935678 V-1     T = -25 °C: 9.398786495 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.23690557 V-1     T = -25 °C: 14.82027184 V-1
Break-through voltage: T = +20 °C: 414.2976824 V     T = -25 °C: 378.0598828 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:24:43 CET oafedulidis Assigned to capsule by script
27. Aug 2021 10:30:09 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:03:46 CET jreher Updated box and position via API.
11. Aug 2020 18:07:24 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:47 CEST jreher Updated APD location via API.
02. Mar 2020 16:43:06 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:22 CET jreher Updated APD location via API.
27. Nov 2019 19:49:45 CET jreher Updated APD location via API.
25. Nov 2019 17:20:23 CET jreher Updated box and position via API.
30. Aug 2019 11:27:28 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:14 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:29 CET Tobias Corrected dark current unit.
02. Oct 2018 12:16:00 CEST markus.moritz
26. Sep 2018 10:52:31 CEST markus.moritz
06. Jul 2018 22:38:52 CEST Tobias Imported from Hamamatsu datasheet.