RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3101033824 - Archived data from Tue, 11. August 2020 18:07:23 CEST


This is all the information about APD 3101033824. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3101033824
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F14
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 388.4 V
Dark current: 19.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 119
Position in Box: 32
EP1 batch: 128
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.1775445 V     T = -25 °C: 352.3999185 V
Voltage for Gain 150: T = +20 °C: 395.9742529 V     T = -25 °C: 359.8300934 V
Voltage for Gain 200: T = +20 °C: 400.3031671 V     T = -25 °C: 363.9998066 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.590256599 V-1     T = -25 °C: 4.764735068 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.043778709 V-1     T = -25 °C: 9.601190354 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.16601305 V-1     T = -25 °C: 15.13319706 V-1
Break-through voltage: T = +20 °C: 414.9390012 V     T = -25 °C: 378.8264662 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:46 CET jreher Updated box and position via API.
11. Aug 2020 18:07:23 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:46 CEST jreher Updated APD location via API.
02. Mar 2020 16:43:06 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:21 CET jreher Updated APD location via API.
27. Nov 2019 19:49:44 CET jreher Updated APD location via API.
25. Nov 2019 17:20:23 CET jreher Updated box and position via API.
30. Aug 2019 11:27:27 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:14 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:29 CET Tobias Corrected dark current unit.
02. Oct 2018 12:06:25 CEST markus.moritz
26. Sep 2018 10:52:06 CEST markus.moritz
06. Jul 2018 22:38:52 CEST Tobias Imported from Hamamatsu datasheet.