RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3101033818 - Archived data from Tue, 11. August 2020 18:07:22 CEST


This is all the information about APD 3101033818. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3101033818
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 387.4 V
Dark current: 22.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 119
Position in Box: 27
EP1 batch: 128
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.3708346 V     T = -25 °C: 351.6638405 V
Voltage for Gain 150: T = +20 °C: 395.1526702 V     T = -25 °C: 359.118849 V
Voltage for Gain 200: T = +20 °C: 399.4786189 V     T = -25 °C: 363.3363419 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.542638525 V-1     T = -25 °C: 4.67488232 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.97916418 V-1     T = -25 °C: 9.294137364 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.85378381 V-1     T = -25 °C: 14.4853575 V-1
Break-through voltage: T = +20 °C: 414.1169727 V     T = -25 °C: 378.2288973 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:45 CET jreher Updated box and position via API.
11. Aug 2020 18:07:22 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:46 CEST jreher Updated APD location via API.
02. Mar 2020 16:40:48 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:21 CET jreher Updated APD location via API.
27. Nov 2019 19:49:44 CET jreher Updated APD location via API.
25. Nov 2019 17:20:23 CET jreher Updated box and position via API.
30. Aug 2019 11:27:27 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:13 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:29 CET Tobias Corrected dark current unit.
02. Oct 2018 11:59:48 CEST markus.moritz
26. Sep 2018 10:51:41 CEST markus.moritz
06. Jul 2018 22:38:52 CEST Tobias Imported from Hamamatsu datasheet.