RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3101033814


This is all the information about APD 3101033814. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3101033814
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.5 V
Dark current: 20.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 419
Position in Box: 33
EP1 batch: none
EP1 batch after irradiation: 10657
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7908943 V     T = -25 °C: 346.3169673 V
Voltage for Gain 150: T = +20 °C: 389.59113 V     T = -25 °C: 353.6029389 V
Voltage for Gain 200: T = +20 °C: 393.9224062 V     T = -25 °C: 357.6773329 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.691132444 V-1     T = -25 °C: 4.841928652 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.286710939 V-1     T = -25 °C: 9.926259754 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.5258088 V-1     T = -25 °C: 15.90737189 V-1
Break-through voltage: T = +20 °C: 409.4589188 V     T = -25 °C: 372.8723278 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
16. Apr 2021 22:09:27 CEST jreher Updated APD characteristics via API.
16. Apr 2021 10:29:34 CEST jreher Updated APD location via API.
31. Mar 2021 14:15:16 CEST jreher Updated box and position via API.
26. Feb 2021 15:47:34 CET jreher Updated APD batch assignment via API.
05. Feb 2021 11:03:45 CET jreher Updated box and position via API.
03. Feb 2021 18:06:58 CET jreher Updated APD location via API.
28. Nov 2019 10:39:03 CET jreher Updated APD location via API.
27. Nov 2019 19:49:44 CET jreher Updated APD location via API.
25. Nov 2019 17:20:22 CET jreher Updated box and position via API.
05. Jul 2019 13:52:13 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:29 CET Tobias Corrected dark current unit.
02. Oct 2018 11:47:40 CEST markus.moritz
26. Sep 2018 10:40:29 CEST markus.moritz
06. Jul 2018 22:38:52 CEST Tobias Imported from Hamamatsu datasheet.