RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3009033776 - Archived data from Tue, 11. August 2020 18:07:17 CEST


This is all the information about APD 3009033776. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3009033776
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 384.9 V
Dark current: 15.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 119
Position in Box: 8
EP1 batch: 127
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.2703201 V     T = -25 °C: 349.4600027 V
Voltage for Gain 150: T = +20 °C: 393.0940327 V     T = -25 °C: 356.8329101 V
Voltage for Gain 200: T = +20 °C: 397.4502774 V     T = -25 °C: 360.9775589 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.509183273 V-1     T = -25 °C: 4.73468877 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.864517437 V-1     T = -25 °C: 9.602133569 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.60184176 V-1     T = -25 °C: 15.26246606 V-1
Break-through voltage: T = +20 °C: 413.1354008 V     T = -25 °C: 376.4033026 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 11:03:43 CET jreher Updated box and position via API.
11. Aug 2020 18:07:17 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:44 CEST jreher Updated APD location via API.
02. Mar 2020 16:40:47 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:19 CET jreher Updated APD location via API.
27. Nov 2019 19:49:43 CET jreher Updated APD location via API.
25. Nov 2019 17:20:21 CET jreher Updated box and position via API.
30. Aug 2019 11:27:49 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:12 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:28 CET Tobias Corrected dark current unit.
21. Aug 2018 10:48:00 CEST markus.moritz
06. Jul 2018 22:38:52 CEST Tobias Imported from Hamamatsu datasheet.