RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3009033773 - Archived data from Tue, 11. August 2020 18:07:17 CEST


This is all the information about APD 3009033773. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3009033773
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.6 V
Dark current: 18.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 119
Position in Box: 5
EP1 batch: 127
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.1702396 V     T = -25 °C: 352.8409007 V
Voltage for Gain 150: T = +20 °C: 395.9862499 V     T = -25 °C: 360.588482 V
Voltage for Gain 200: T = +20 °C: 400.3228618 V     T = -25 °C: 364.7166022 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.557840781 V-1     T = -25 °C: 3.584463546 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.023755105 V-1     T = -25 °C: 11.99753778 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.08606562 V-1     T = -25 °C: 15.31633256 V-1
Break-through voltage: T = +20 °C: 415.799935 V     T = -25 °C: 379.8455527 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 11:03:43 CET jreher Updated box and position via API.
11. Aug 2020 18:07:17 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:44 CEST jreher Updated APD location via API.
02. Mar 2020 16:40:47 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:19 CET jreher Updated APD location via API.
27. Nov 2019 19:49:42 CET jreher Updated APD location via API.
25. Nov 2019 17:20:21 CET jreher Updated box and position via API.
30. Aug 2019 11:27:49 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:12 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:28 CET Tobias Corrected dark current unit.
21. Aug 2018 10:45:52 CEST markus.moritz
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.