RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3009033769 - Archived data from Fri, 05. February 2021 11:03:42 CET


This is all the information about APD 3009033769. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3009033769
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 387.3 V
Dark current: 20.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 119
Position in Box: 1
EP1 batch: 127
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.3075019 V     T = -25 °C: 350.4237576 V
Voltage for Gain 150: T = +20 °C: 394.1186964 V     T = -25 °C: 357.8859038 V
Voltage for Gain 200: T = +20 °C: 398.4611536 V     T = -25 °C: 362.0754021 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.535701162 V-1     T = -25 °C: 4.705124312 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.923164517 V-1     T = -25 °C: 9.536567592 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.79978918 V-1     T = -25 °C: 14.98986756 V-1
Break-through voltage: T = +20 °C: 412.9938153 V     T = -25 °C: 376.6678784 V
   
Notes: foam


Version history

Time Author Change comment
19. May 2022 15:27:26 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:45 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:03:42 CET jreher Updated box and position via API.
11. Aug 2020 18:07:16 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:43 CEST jreher Updated APD location via API.
02. Mar 2020 16:40:46 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:19 CET jreher Updated APD location via API.
27. Nov 2019 19:49:42 CET jreher Updated APD location via API.
25. Nov 2019 17:20:21 CET jreher Updated box and position via API.
30. Aug 2019 11:27:49 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:11 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:28 CET Tobias Corrected dark current unit.
21. Aug 2018 10:41:53 CEST markus.moritz
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.