RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3009033755 - Archived data from Tue, 11. August 2020 18:07:13 CEST


This is all the information about APD 3009033755. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3009033755
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 384.9 V
Dark current: 17.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 38
EP1 batch: 127
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.0298284 V     T = -25 °C: 349.2256506 V
Voltage for Gain 150: T = +20 °C: 392.8485946 V     T = -25 °C: 356.6282451 V
Voltage for Gain 200: T = +20 °C: 397.1925934 V     T = -25 °C: 360.7669199 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.607911589 V-1     T = -25 °C: 4.786142718 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.15683173 V-1     T = -25 °C: 9.858537782 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.32517005 V-1     T = -25 °C: 15.74725083 V-1
Break-through voltage: T = +20 °C: 412.7974817 V     T = -25 °C: 376.1524613 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:23:59 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:01:53 CEST jreher Updated box and position via API.
05. Feb 2021 11:03:39 CET jreher Updated box and position via API.
11. Aug 2020 18:07:13 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:42 CEST jreher Updated APD location via API.
02. Mar 2020 16:21:37 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:18 CET jreher Updated APD location via API.
27. Nov 2019 19:49:34 CET jreher Updated APD location via API.
25. Nov 2019 17:20:19 CET jreher Updated box and position via API.
30. Aug 2019 11:27:48 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:06 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:28 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.