RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3009033750 - Archived data from Fri, 05. February 2021 11:03:38 CET


This is all the information about APD 3009033750. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3009033750
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E13
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.1 V
Dark current: 19.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 33
EP1 batch: 127
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.0341341 V     T = -25 °C: 353.0460572 V
Voltage for Gain 150: T = +20 °C: 396.8514831 V     T = -25 °C: 360.575516 V
Voltage for Gain 200: T = +20 °C: 401.1910998 V     T = -25 °C: 364.7732113 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.618378779 V-1     T = -25 °C: 4.850181424 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.189421551 V-1     T = -25 °C: 8.810958752 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.34177989 V-1     T = -25 °C: 15.48948395 V-1
Break-through voltage: T = +20 °C: 416.6299134 V     T = -25 °C: 380.2508857 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:18:30 CET oafedulidis Assigned to capsule by script
09. Dec 2021 13:10:29 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:03:38 CET jreher Updated box and position via API.
11. Aug 2020 18:07:12 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:42 CEST jreher Updated APD location via API.
02. Mar 2020 16:21:37 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:17 CET jreher Updated APD location via API.
27. Nov 2019 19:49:33 CET jreher Updated APD location via API.
25. Nov 2019 17:20:18 CET jreher Updated box and position via API.
30. Aug 2019 11:27:47 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:06 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:27 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.