RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3008033744 - Archived data from Tue, 11. August 2020 18:07:11 CEST


This is all the information about APD 3008033744. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3008033744
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.9 V
Dark current: 21.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 28
EP1 batch: 126
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.0185935 V     T = -25 °C: 350.3692357 V
Voltage for Gain 150: T = +20 °C: 393.8568983 V     T = -25 °C: 357.8207955 V
Voltage for Gain 200: T = +20 °C: 398.221023 V     T = -25 °C: 362.0067977 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.588645066 V-1     T = -25 °C: 4.710148841 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.069813719 V-1     T = -25 °C: 9.476901139 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.03783333 V-1     T = -25 °C: 14.92790243 V-1
Break-through voltage: T = +20 °C: 413.2282469 V     T = -25 °C: 376.9715891 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:27:24 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:43 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:03:37 CET jreher Updated box and position via API.
11. Aug 2020 18:07:11 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:41 CEST jreher Updated APD location via API.
02. Mar 2020 16:21:37 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:17 CET jreher Updated APD location via API.
27. Nov 2019 19:49:33 CET jreher Updated APD location via API.
25. Nov 2019 17:20:18 CET jreher Updated box and position via API.
30. Aug 2019 11:28:11 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:05 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:27 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.