RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3008033735 - Archived data from Fri, 05. July 2019 13:52:05 CEST


This is all the information about APD 3008033735. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3008033735
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum Box 118
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.4 V
Dark current: 22 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 21
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:35:42 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 16:57:59 CEST jreher Updated box and position via API.
05. Feb 2021 11:03:37 CET jreher Updated box and position via API.
11. Aug 2020 18:07:10 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:41 CEST jreher Updated APD location via API.
02. Mar 2020 16:21:36 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:16 CET jreher Updated APD location via API.
27. Nov 2019 19:49:32 CET jreher Updated APD location via API.
25. Nov 2019 17:20:17 CET jreher Updated box and position via API.
30. Aug 2019 11:28:11 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:05 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:27 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.