RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3008033732 - Archived data from Thu, 15. April 2021 17:01:00 CEST


This is all the information about APD 3008033732. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3008033732
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F12
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 20.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 19
EP1 batch: 126
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.6085565 V     T = -25 °C: 349.1141119 V
Voltage for Gain 150: T = +20 °C: 392.4299359 V     T = -25 °C: 356.5280352 V
Voltage for Gain 200: T = +20 °C: 396.7733491 V     T = -25 °C: 360.6693392 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.418610458 V-1     T = -25 °C: 4.857505456 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.672597117 V-1     T = -25 °C: 9.00220951 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.11790651 V-1     T = -25 °C: 16.01083623 V-1
Break-through voltage: T = +20 °C: 411.8931406 V     T = -25 °C: 375.5867365 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:22:40 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:00 CEST jreher Updated box and position via API.
05. Feb 2021 11:03:36 CET jreher Updated box and position via API.
11. Aug 2020 18:07:09 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:41 CEST jreher Updated APD location via API.
02. Mar 2020 16:21:36 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:16 CET jreher Updated APD location via API.
27. Nov 2019 19:49:32 CET jreher Updated APD location via API.
25. Nov 2019 17:20:17 CET jreher Updated box and position via API.
30. Aug 2019 11:28:11 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:05 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:27 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.