RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3008033718 - Archived data from Tue, 21. July 2020 14:33:47 CEST


This is all the information about APD 3008033718. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3008033718
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Giessen
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 391.7 V
Dark current: 20.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 10
EP1 batch: 126
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:35 CET jreher Updated box and position via API.
11. Aug 2020 18:07:07 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:40 CEST jreher Updated APD location via API.
21. Jul 2020 14:33:47 CEST jreher Updated APD batch assignment via API.
21. Jul 2020 14:33:20 CEST jreher Updated APD batch assignment via API.
02. Mar 2020 16:15:19 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:16 CET jreher Updated APD location via API.
27. Nov 2019 19:49:32 CET jreher Updated APD location via API.
25. Nov 2019 17:20:17 CET jreher Updated box and position via API.
30. Aug 2019 11:28:10 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:27 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.