RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3008033715 - Archived data from Mon, 17. May 2021 09:17:16 CEST


This is all the information about APD 3008033715. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3008033715
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.3 V
Dark current: 27.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 7
EP1 batch: 126
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.4305322 V     T = -25 °C: 349.7835568 V
Voltage for Gain 150: T = +20 °C: 393.291255 V     T = -25 °C: 357.1527873 V
Voltage for Gain 200: T = +20 °C: 397.6440794 V     T = -25 °C: 361.4074783 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.449458993 V-1     T = -25 °C: 4.988655569 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.639568738 V-1     T = -25 °C: 9.137488361 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.05076208 V-1     T = -25 °C: 17.30176604 V-1
Break-through voltage: T = +20 °C: 412.9905837 V     T = -25 °C: 376.5494294 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 15:57:19 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:17:16 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:03:35 CET jreher Updated box and position via API.
11. Aug 2020 18:07:07 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:39 CEST jreher Updated APD location via API.
21. Jul 2020 14:33:47 CEST jreher Updated APD batch assignment via API.
21. Jul 2020 14:33:19 CEST jreher Updated APD batch assignment via API.
02. Mar 2020 16:15:18 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:15 CET jreher Updated APD location via API.
27. Nov 2019 19:49:31 CET jreher Updated APD location via API.
25. Nov 2019 17:20:16 CET jreher Updated box and position via API.
30. Aug 2019 11:28:10 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:27 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.