RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3008033714 - Archived data from Tue, 11. August 2020 18:07:07 CEST


This is all the information about APD 3008033714. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3008033714
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.7 V
Dark current: 20.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 6
EP1 batch: 126
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.9255312 V     T = -25 °C: 356.0561242 V
Voltage for Gain 150: T = +20 °C: 399.8256982 V     T = -25 °C: 363.5308795 V
Voltage for Gain 200: T = +20 °C: 404.2204617 V     T = -25 °C: 367.7236226 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.509486933 V-1     T = -25 °C: 5.047259323 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.957349764 V-1     T = -25 °C: 9.85502019 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.89688183 V-1     T = -25 °C: 15.53085632 V-1
Break-through voltage: T = +20 °C: 419.7082537 V     T = -25 °C: 383.149136 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:35 CET jreher Updated box and position via API.
11. Aug 2020 18:07:07 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:39 CEST jreher Updated APD location via API.
21. Jul 2020 14:33:47 CEST jreher Updated APD batch assignment via API.
21. Jul 2020 14:33:19 CEST jreher Updated APD batch assignment via API.
02. Mar 2020 16:15:18 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:15 CET jreher Updated APD location via API.
27. Nov 2019 19:49:31 CET jreher Updated APD location via API.
25. Nov 2019 17:20:16 CET jreher Updated box and position via API.
30. Aug 2019 11:28:10 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:27 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.