RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3008033709 - Archived data from Fri, 05. February 2021 11:03:34 CET


This is all the information about APD 3008033709. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3008033709
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 391.4 V
Dark current: 20.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 3
EP1 batch: 126
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.7981214 V     T = -25 °C: 354.9236419 V
Voltage for Gain 150: T = +20 °C: 398.6547211 V     T = -25 °C: 362.4131495 V
Voltage for Gain 200: T = +20 °C: 403.014437 V     T = -25 °C: 366.6335076 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.640190977 V-1     T = -25 °C: 4.870942489 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.225068006 V-1     T = -25 °C: 9.527695965 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.36709785 V-1     T = -25 °C: 15.58294922 V-1
Break-through voltage: T = +20 °C: 418.1916104 V     T = -25 °C: 381.8599234 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2022 09:59:03 CET oafedulidis Assigned to capsule by script
16. Dec 2021 13:42:34 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:03:34 CET jreher Updated box and position via API.
11. Aug 2020 18:07:06 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:39 CEST jreher Updated APD location via API.
21. Jul 2020 14:33:46 CEST jreher Updated APD batch assignment via API.
21. Jul 2020 14:33:19 CEST jreher Updated APD batch assignment via API.
02. Mar 2020 16:15:18 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:15 CET jreher Updated APD location via API.
27. Nov 2019 19:49:31 CET jreher Updated APD location via API.
25. Nov 2019 17:20:16 CET jreher Updated box and position via API.
30. Aug 2019 11:28:09 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:26 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.