RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3006033613 - Archived data from Mon, 17. May 2021 09:16:41 CEST


This is all the information about APD 3006033613. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3006033613
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.4 V
Dark current: 25.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 116
Position in Box: 48
EP1 batch: 124
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.5254124 V     T = -25 °C: 348.093273 V
Voltage for Gain 150: T = +20 °C: 391.3831894 V     T = -25 °C: 355.437291 V
Voltage for Gain 200: T = +20 °C: 395.7487691 V     T = -25 °C: 359.5217364 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.36848585 V-1     T = -25 °C: 4.718468645 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.48446474 V-1     T = -25 °C: 10.42210393 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.6909398 V-1     T = -25 °C: 15.49428015 V-1
Break-through voltage: T = +20 °C: 411.2308843 V     T = -25 °C: 374.7609306 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:35:53 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:16:41 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:03:24 CET jreher Updated box and position via API.
11. Aug 2020 18:07:05 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:34 CEST jreher Updated APD location via API.
21. Jul 2020 14:33:46 CEST jreher Updated APD batch assignment via API.
21. Jul 2020 14:33:19 CEST jreher Updated APD batch assignment via API.
02. Mar 2020 16:15:18 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:11 CET jreher Updated APD location via API.
27. Nov 2019 19:49:12 CET jreher Updated APD location via API.
25. Nov 2019 17:20:10 CET jreher Updated box and position via API.
27. Aug 2019 12:09:07 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:25 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:50 CEST Tobias Imported from Hamamatsu datasheet.