Show Hamamatsu Avalanche Photo Diode 3006033594 - Archived data from Wed, 14. April 2021 18:46:29 CEST


This is all the information about APD 3006033594. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3006033594
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 0718006769/3006033594
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385 V
Dark current: 24.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 116
Position in Box: 33
EP1 batch: 123
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.9804111 V     T = -25 °C: 349.3943027 V
Voltage for Gain 150: T = +20 °C: 392.8582532 V     T = -25 °C: 356.8385536 V
Voltage for Gain 200: T = +20 °C: 397.2457101 V     T = -25 °C: 361.0049211 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.57671371 V-1     T = -25 °C: 4.726267654 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.014091119 V-1     T = -25 °C: 9.488413132 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.88494327 V-1     T = -25 °C: 14.95695293 V-1
Break-through voltage: T = +20 °C: 412.935878 V     T = -25 °C: 376.4708104 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:05 CEST jreher Updated box and position via API.
14. Apr 2021 18:46:29 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:03:23 CET jreher Updated box and position via API.
11. Aug 2020 18:07:02 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:33 CEST jreher Updated APD location via API.
02. Mar 2020 16:10:08 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:10 CET jreher Updated APD location via API.
27. Nov 2019 19:49:11 CET jreher Updated APD location via API.
25. Nov 2019 17:20:09 CET jreher Updated box and position via API.
27. Aug 2019 12:09:36 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:50 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:24 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:49 CEST Tobias Imported from Hamamatsu datasheet.