RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3006033577 - Archived data from Thu, 15. April 2021 16:43:14 CEST


This is all the information about APD 3006033577. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3006033577
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 3006033577/2904032750
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 387.4 V
Dark current: 23.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 116
Position in Box: 20
EP1 batch: 123
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.4983523 V     T = -25 °C: 351.8765382 V
Voltage for Gain 150: T = +20 °C: 395.2937729 V     T = -25 °C: 359.3491578 V
Voltage for Gain 200: T = +20 °C: 399.6110289 V     T = -25 °C: 363.5271372 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.45953401 V-1     T = -25 °C: 4.891593718 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.769188009 V-1     T = -25 °C: 9.014235686 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.33883581 V-1     T = -25 °C: 16.00184825 V-1
Break-through voltage: T = +20 °C: 414.6672252 V     T = -25 °C: 378.538133 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:08 CEST jreher Updated box and position via API.
15. Apr 2021 16:43:14 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:03:21 CET jreher Updated box and position via API.
11. Aug 2020 18:06:59 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:32 CEST jreher Updated APD location via API.
02. Mar 2020 16:10:07 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:09 CET jreher Updated APD location via API.
27. Nov 2019 19:49:10 CET jreher Updated APD location via API.
25. Nov 2019 17:20:08 CET jreher Updated box and position via API.
27. Aug 2019 12:09:35 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:49 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:24 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:49 CEST Tobias Imported from Hamamatsu datasheet.