RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3006033565 - Archived data from Fri, 05. February 2021 11:03:20 CET


This is all the information about APD 3006033565. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3006033565
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 420 V
Voltage for Gain 100 (T=+25°C): 392.4 V
Dark current: 22.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 116
Position in Box: 8
EP1 batch: 123
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.5411708 V     T = -25 °C: 355.4889966 V
Voltage for Gain 150: T = +20 °C: 399.4522058 V     T = -25 °C: 363.0899647 V
Voltage for Gain 200: T = +20 °C: 403.83635 V     T = -25 °C: 367.3549422 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.428351638 V-1     T = -25 °C: 4.638629556 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.630096816 V-1     T = -25 °C: 9.231954011 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.07443266 V-1     T = -25 °C: 14.46673329 V-1
Break-through voltage: T = +20 °C: 418.6708482 V     T = -25 °C: 382.4411585 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:29:27 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:10:50 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:03:20 CET jreher Updated box and position via API.
11. Aug 2020 18:06:56 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:30 CEST jreher Updated APD location via API.
02. Mar 2020 16:10:06 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:08 CET jreher Updated APD location via API.
27. Nov 2019 19:49:09 CET jreher Updated APD location via API.
25. Nov 2019 17:20:07 CET jreher Updated box and position via API.
27. Aug 2019 12:09:35 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:48 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:23 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:49 CEST Tobias Imported from Hamamatsu datasheet.