RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3006033564 - Archived data from Tue, 11. August 2020 18:06:56 CEST


This is all the information about APD 3006033564. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3006033564
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 391.2 V
Dark current: 23.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 116
Position in Box: 7
EP1 batch: 123
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.058406 V     T = -25 °C: 355.0769376 V
Voltage for Gain 150: T = +20 °C: 398.9361853 V     T = -25 °C: 362.6288519 V
Voltage for Gain 200: T = +20 °C: 403.3187774 V     T = -25 °C: 366.8453617 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.577912217 V-1     T = -25 °C: 4.802581166 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.023789506 V-1     T = -25 °C: 9.686351946 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.99620794 V-1     T = -25 °C: 15.26124146 V-1
Break-through voltage: T = +20 °C: 419.0345101 V     T = -25 °C: 382.5733788 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 16:06:50 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:16:06 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:03:19 CET jreher Updated box and position via API.
11. Aug 2020 18:06:56 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:30 CEST jreher Updated APD location via API.
02. Mar 2020 16:10:06 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:08 CET jreher Updated APD location via API.
27. Nov 2019 19:49:09 CET jreher Updated APD location via API.
25. Nov 2019 17:20:07 CET jreher Updated box and position via API.
27. Aug 2019 12:09:34 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:48 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:23 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:49 CEST Tobias Imported from Hamamatsu datasheet.