RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3005033519 - Archived data from Tue, 11. August 2020 18:06:52 CEST


This is all the information about APD 3005033519. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3005033519
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 19.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 115
Position in Box: 33
EP1 batch: 122
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.0716163 V     T = -25 °C: 345.2770487 V
Voltage for Gain 150: T = +20 °C: 387.9576238 V     T = -25 °C: 352.6113357 V
Voltage for Gain 200: T = +20 °C: 392.3756903 V     T = -25 °C: 356.6542037 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.562313351 V-1     T = -25 °C: 4.990439676 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.959515491 V-1     T = -25 °C: 9.926635554 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.76047289 V-1     T = -25 °C: 15.71901402 V-1
Break-through voltage: T = +20 °C: 408.2686426 V     T = -25 °C: 371.7799513 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:14 CET jreher Updated box and position via API.
11. Aug 2020 18:06:52 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:28 CEST jreher Updated APD location via API.
02. Mar 2020 15:53:46 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:06 CET jreher Updated APD location via API.
27. Nov 2019 19:49:00 CET jreher Updated APD location via API.
25. Nov 2019 17:20:04 CET jreher Updated box and position via API.
27. Aug 2019 12:09:56 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:42 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:23 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:48 CEST Tobias Imported from Hamamatsu datasheet.