RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3005033505 - Archived data from Tue, 11. August 2020 18:06:51 CEST


This is all the information about APD 3005033505. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3005033505
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 18.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 115
Position in Box: 27
EP1 batch: 122
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.8958488 V     T = -25 °C: 346.1562916 V
Voltage for Gain 150: T = +20 °C: 388.772226 V     T = -25 °C: 353.4807048 V
Voltage for Gain 200: T = +20 °C: 393.1640812 V     T = -25 °C: 357.5176827 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.603699421 V-1     T = -25 °C: 4.799759335 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.073175865 V-1     T = -25 °C: 9.043129909 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.091226 V-1     T = -25 °C: 17.18525882 V-1
Break-through voltage: T = +20 °C: 408.7021765 V     T = -25 °C: 372.3118805 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:14 CET jreher Updated box and position via API.
11. Aug 2020 18:06:51 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:28 CEST jreher Updated APD location via API.
02. Mar 2020 15:53:45 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:06 CET jreher Updated APD location via API.
27. Nov 2019 19:48:59 CET jreher Updated APD location via API.
25. Nov 2019 17:20:04 CET jreher Updated box and position via API.
27. Aug 2019 12:09:56 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:41 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:22 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:48 CEST Tobias Imported from Hamamatsu datasheet.