RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3005033496 - Archived data from Fri, 06. July 2018 22:38:48 CEST


This is all the information about APD 3005033496. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3005033496
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 1.82E-8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 115
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:05:46 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:36 CET jreher Updated box and position via API.
05. Feb 2021 11:03:13 CET jreher Updated box and position via API.
11. Aug 2020 18:06:49 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:27 CEST jreher Updated APD location via API.
25. Feb 2020 16:44:12 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:05 CET jreher Updated APD location via API.
27. Nov 2019 19:48:59 CET jreher Updated APD location via API.
25. Nov 2019 17:20:03 CET jreher Updated box and position via API.
27. Aug 2019 12:10:16 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:41 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:22 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:48 CEST Tobias Imported from Hamamatsu datasheet.