RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3005033485 - Archived data from Fri, 27. August 2021 11:12:29 CEST


This is all the information about APD 3005033485. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3005033485
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 18.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 115
Position in Box: 9
EP1 batch: 121
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7734109 V     T = -25 °C: 346.5591936 V
Voltage for Gain 150: T = +20 °C: 389.587605 V     T = -25 °C: 353.9218537 V
Voltage for Gain 200: T = +20 °C: 393.9313393 V     T = -25 °C: 358.0441827 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.397994261 V-1     T = -25 °C: 4.747439732 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.601469714 V-1     T = -25 °C: 9.762623128 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.01955888 V-1     T = -25 °C: 15.54957751 V-1
Break-through voltage: T = +20 °C: 409.6759062 V     T = -25 °C: 373.430272 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:15:07 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:12:29 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:03:12 CET jreher Updated box and position via API.
11. Aug 2020 18:06:47 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:26 CEST jreher Updated APD location via API.
25. Feb 2020 16:44:11 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:04 CET jreher Updated APD location via API.
27. Nov 2019 19:48:58 CET jreher Updated APD location via API.
25. Nov 2019 17:20:02 CET jreher Updated box and position via API.
27. Aug 2019 12:10:15 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:22 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:48 CEST Tobias Imported from Hamamatsu datasheet.