RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3004033470 - Archived data from Wed, 16. June 2021 16:00:24 CEST


This is all the information about APD 3004033470. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3004033470
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H10
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 388.9 V
Dark current: 22.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 114
Position in Box: 49
EP1 batch: 121
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.3905392 V     T = -25 °C: 352.5727814 V
Voltage for Gain 150: T = +20 °C: 396.3172417 V     T = -25 °C: 360.1050826 V
Voltage for Gain 200: T = +20 °C: 400.721124 V     T = -25 °C: 364.3477884 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.454096005 V-1     T = -25 °C: 4.649322071 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.652471379 V-1     T = -25 °C: 9.199379155 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.93457435 V-1     T = -25 °C: 14.32997915 V-1
Break-through voltage: T = +20 °C: 415.4842133 V     T = -25 °C: 379.5971562 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 16:15:13 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:04:11 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:24 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:53:04 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:03:08 CET jreher Updated box and position via API.
11. Aug 2020 18:06:45 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:25 CEST jreher Updated APD location via API.
25. Feb 2020 16:44:10 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:04 CET jreher Updated APD location via API.
27. Nov 2019 19:48:50 CET jreher Updated APD location via API.
25. Nov 2019 17:20:01 CET jreher Updated box and position via API.
27. Aug 2019 12:10:14 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:35 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:22 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:48 CEST Tobias Imported from Hamamatsu datasheet.