RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3004033442 - Archived data from Fri, 05. February 2021 11:03:05 CET


This is all the information about APD 3004033442. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3004033442
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.9 V
Dark current: 21.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 114
Position in Box: 25
EP1 batch: 120
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.7522263 V     T = -25 °C: 357.5648814 V
Voltage for Gain 150: T = +20 °C: 400.593297 V     T = -25 °C: 364.8757496 V
Voltage for Gain 200: T = +20 °C: 404.9665727 V     T = -25 °C: 369.1153914 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.686747041 V-1     T = -25 °C: 4.621036725 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.300895082 V-1     T = -25 °C: 9.128808513 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.35234902 V-1     T = -25 °C: 13.77684812 V-1
Break-through voltage: T = +20 °C: 420.946989 V     T = -25 °C: 384.7249172 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:18:08 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:14:53 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:03:05 CET jreher Updated box and position via API.
11. Aug 2020 18:06:40 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:23 CEST jreher Updated APD location via API.
25. Feb 2020 16:44:38 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:02 CET jreher Updated APD location via API.
27. Nov 2019 19:48:48 CET jreher Updated APD location via API.
25. Nov 2019 17:19:57 CET jreher Updated box and position via API.
27. Aug 2019 12:10:39 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:33 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:21 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:47 CEST Tobias Imported from Hamamatsu datasheet.