RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3004033434 - Archived data from Tue, 11. August 2020 18:06:39 CEST


This is all the information about APD 3004033434. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3004033434
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 389 V
Dark current: 23.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 114
Position in Box: 18
EP1 batch: 120
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.5320971 V     T = -25 °C: 353.1283359 V
Voltage for Gain 150: T = +20 °C: 396.3686366 V     T = -25 °C: 360.4419873 V
Voltage for Gain 200: T = +20 °C: 400.6856068 V     T = -25 °C: 364.6772771 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.470379636 V-1     T = -25 °C: 4.672598175 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.6040541 V-1     T = -25 °C: 11.59742239 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.34023026 V-1     T = -25 °C: 18.5303446 V-1
Break-through voltage: T = +20 °C: 416.3977464 V     T = -25 °C: 378.6144469 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:05 CET jreher Updated box and position via API.
11. Aug 2020 18:06:39 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:22 CEST jreher Updated APD location via API.
25. Feb 2020 16:44:38 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:01 CET jreher Updated APD location via API.
27. Nov 2019 19:48:48 CET jreher Updated APD location via API.
25. Nov 2019 17:19:56 CET jreher Updated box and position via API.
27. Aug 2019 12:10:38 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:33 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:21 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:47 CEST Tobias Imported from Hamamatsu datasheet.