RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3003033388 - Archived data from Fri, 05. February 2021 11:03:00 CET


This is all the information about APD 3003033388. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3003033388
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.6 V
Dark current: 17.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 113
Position in Box: 45
EP1 batch: 119
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.6421426 V     T = -25 °C: 343.7203195 V
Voltage for Gain 150: T = +20 °C: 386.4570263 V     T = -25 °C: 351.0411735 V
Voltage for Gain 200: T = +20 °C: 390.8057706 V     T = -25 °C: 355.1575701 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.423867869 V-1     T = -25 °C: 5.046986739 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.562402488 V-1     T = -25 °C: 9.486924454 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.78375056 V-1     T = -25 °C: 14.96828987 V-1
Break-through voltage: T = +20 °C: 406.2894572 V     T = -25 °C: 370.2303232 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:32:23 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:50 CEST jreher Updated box and position via API.
05. Feb 2021 11:03:00 CET jreher Updated box and position via API.
11. Aug 2020 18:06:34 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:20 CEST jreher Updated APD location via API.
25. Feb 2020 16:45:18 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:59 CET jreher Updated APD location via API.
27. Nov 2019 19:48:39 CET jreher Updated APD location via API.
25. Nov 2019 17:19:54 CET jreher Updated box and position via API.
27. Aug 2019 12:10:58 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:27 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:20 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:47 CEST Tobias Imported from Hamamatsu datasheet.