RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3003033383 - Archived data from Tue, 16. February 2021 12:28:30 CET


This is all the information about APD 3003033383. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3003033383
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 385.9 V
Dark current: 18.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 113
Position in Box: 40
EP1 batch: 119
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.7594111 V     T = -25 °C: 350.028181 V
Voltage for Gain 150: T = +20 °C: 393.5829025 V     T = -25 °C: 357.5255417 V
Voltage for Gain 200: T = +20 °C: 397.9215606 V     T = -25 °C: 361.7150101 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.715894747 V-1     T = -25 °C: 4.850994672 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.560431372 V-1     T = -25 °C: 8.961645121 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.84372575 V-1     T = -25 °C: 15.76057686 V-1
Break-through voltage: T = +20 °C: 413.0261845 V     T = -25 °C: 376.9596128 V
   
Notes:


Version history

Time Author Change comment
14. Apr 2021 14:20:32 CEST jreher Assigned to capsule by script
16. Feb 2021 12:28:30 CET jreher Updated box and position via API.
05. Feb 2021 11:02:59 CET jreher Updated box and position via API.
11. Aug 2020 18:06:33 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:20 CEST jreher Updated APD location via API.
25. Feb 2020 16:45:17 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:59 CET jreher Updated APD location via API.
27. Nov 2019 19:48:38 CET jreher Updated APD location via API.
25. Nov 2019 17:19:53 CET jreher Updated box and position via API.
27. Aug 2019 12:10:58 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:26 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:20 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:47 CEST Tobias Imported from Hamamatsu datasheet.